Skip to main content

Watertown Home Additions

Home additions in Watertown, from the lot line in

You want more room, and in Watertown you cannot spread out to get it. The first question an owner asks is not what it will look like. It is whether the City of Watertown’s zoning ordinance lets you build it at all. We answer that in writing, before a drawing exists.

Watertown covers about four square miles and was built out early. Much of the housing is two-family, on five- and six-thousand-square-foot lots, with side yards you can shake hands across and a driveway that is also the only parking. Most of it predates the ordinance, so the house is often nonconforming before anyone draws a line.

Start at the lot line, not the floor plan

Start at the lot line, not the floor plan

Your district, and what the table allows

Each residence district carries its own limits. We check your district on the site visit and never name one from a street or an address, because a wrong district in print does more harm than silence.

Published in the City of Watertown Table of Dimensional Regulations, distances in feet:

  • S-6: lot 6,000 square feet, frontage 65, front 25, sides 12 and 10, rear 20, building coverage 25%, impervious 85%, open space 15%, height 35 feet and 2.5 stories
  • S-10: lot 10,000 square feet, frontage 80, front 25, sides 15 and 10, rear 20, building coverage 20%, impervious 80%, open space 20%, height 35 feet and 2.5 stories
  • R.75: lot 5,000 square feet, frontage 50, front 15, side 20, rear 25, building coverage 35%, impervious 80%, open space 20%, height 35 feet, floor area ratio 0.75
  • R1.2: lot 5,000 square feet, frontage 50, front 15, side 25, rear 30, building coverage 50%, impervious 80%, open space 20%, height 45 feet, floor area ratio 1.2

Three notes that change the answer:

  • Where two side figures appear, one side yard must meet the first and the other the second.
  • In the S districts, the highest eave cannot exceed 26 feet, whatever the overall height allows.
  • In the S districts, a side yard carrying a driveway needs paving at least eight feet wide and a landscaped buffer four feet deep from the lot line.
What we measure on the visit:

Building coverage and impervious area, in plain terms

Building coverage is how much of your lot the buildings may cover, measured on the ground. The house, a detached garage and a shed all count.

Impervious area is coverage plus everything else water cannot get through: driveway, walks, steps, a paved patio. That is why a new patio or a widened driveway can quietly cost you the addition. The two limits are separate, and a project can pass one and fail the other.

Illustration only, since your measured lot and district set the real numbers: on a 6,000 square foot lot with a 25% coverage limit, all buildings together may cover 1,500 square feet. With an 85% impervious limit, buildings and pavement together may cover 5,100.

What quietly spends the allowance:

Adding up when you cannot add out

When the side yards will not give, the addition goes up: a second storey on the existing footprint, or a dormer. Going up usually leaves building coverage alone, because coverage measures ground. It does not leave height, floor area or the existing structure alone. What gets checked:

The three additions that actually fit a Watertown lot
Start with what your lot allows

Rear bump-outs and the rear setback

The rear setback is 20 feet in S-6 and S-10, 25 in R.75 and 30 in R1.2. A bump-out is enclosed living space, and the ordinance does not exempt enclosed additions from setbacks. It does allow a few small things to project into a setback:

Additions on an owner-occupied two-family

An addition on an owner occupied two family

When a nonconformity gets worse, and what that triggers

A house that sits closer to a lot line than the table allows, or covers more lot than it allows, is nonconforming. That is not a violation, and it does not bar you from building. For single- and two-family homes, the ordinance works in three steps, applied to the house as it would stand finished:

When a finding is needed, the clock is set by law, not by us:

Start at the lot line, not the floor plan
Building ten feet from the neighbours

Building ten feet from the neighbours

What we will not take on

How we arrive at your number

No range and no starting price here. A figure given before measuring is a guess, and guesses are how quotes come apart later.

What we measure

  • lot area and the distance from the house to every lot line, from a survey
  • existing building coverage and impervious area
  • existing roof and eave heights
  • what the foundation, walls and framing can carry
  • access: side yard width, dumpster location, staging, street permit needs

What the written quote itemises

  • demolition and protection of what stays
  • foundation, framing, roof and envelope
  • mechanical, electrical and plumbing work
  • finishes, with allowances stated for selections not yet made
  • site logistics, including the dumpster and any street permit
  • Exclusions, and what happens to scope if a hearing changes the design

Request a written quote

Send us the address and what you want to add. We start with a measured check against the City of Watertown ordinance, and the written quote follows from what that check shows. K&A Home Remodelers is licensed and insured, builds with its own crews, and is based in Waltham.

Questions owners ask before we measure

Can I add a second storey if my house is already too close to the side line?

Possibly. The question is whether the second storey makes the nonconformity worse, and that judgment is made on drawings. We raise it before anyone draws.

It counts toward impervious area, not building coverage. If the lot is near its limit, the patio can use up room the addition needed.

No. We check it on the site visit, against the ordinance and the city’s zoning map.